February 06, 2026
The line has been repaired.
February 06, 2026
Customers in the town of Santo and down North Bosley Rd. may experience lower than normal pressure while we repair a leak on the main line. Crew is on site and we will shut the system down as soon as everything is ready to fix the leak so as to limit the down time as much as possible.